Address: Moscow, Shenogina st., 2, building 3
1 /

About the property

  • Administrative District/District SZAO, Khoroshevo-Mnevniki
  • Object type Premium office building
  • Class Class A
  • Developer GC FSK
  • Year of construction / Renovation 2025
  • Metro Shelepikha
  • Total area of the building 75.1 thousand m²
  • Office area (available units) from 1,270 m² to 29,250 m².
  • Number of floors 24
  • Ceiling height 3.3–3.8 m
  • Layout type Open space
  • Interior decoration without finishing
  • Glazing Panoramic
  • Parking Three-level underground parking for 313 cars and 12 spaces for motorcycles
  • Access to the building Separate from the street
  • Elevators 21 elevators
  • Infrastructure Reception, cafe/canteen, mother and child room, shopping area.
  • Safety Modern engineering systems, 24-hour security and video surveillance
  • Internet and communications High-speed internet, cell signal booster and Wi-Fi, including parking area
  • Conditioning Central air conditioning system
  • Ventilation Supply and exhaust ventilation system, air conditioning
  • Tax Inspectorate (IFTS) No. 34
Need help choosing a property?
real estate?
Submit a request

Description

Sydney City is an independent business center within the multifunctional quarter of the same name on the bank of the Moscow River. The concept involves a balanced set of functions: Class A offices with high consumer properties, rich public spaces on the first levels and technological "stuffing" that supports the comfort and efficiency of users. According to the city, the total volume is about 75 thousand m², with a significant part of the first floors allocated for reception areas and retail and household infrastructure.

The building is designed for 24 above-ground levels with ceiling heights of 3.3–3.8 m on office floors and increased heights on lower levels — up to 8 m. The comfortable engineering “skeleton” includes supply and exhaust ventilation and central air conditioning. As it is commissioned, biometric access (FaceID) and flow analytics are expected to be implemented, as well as VR monitoring of individual zones.

Location and transport accessibility

The site is located at ul. Shenogina, 2 (building 3) in Khoroshevo-Mnevniki, in the northwest of Moscow — a few minutes' drive from Moscow-City and key highways. At the level of the rail framework, the location rests on Shelepikha (metro/MCC), and car access is provided by the Third Transport Ring and Zvenigorodskoye Shosse; the project materials note "5 minutes to Moscow-City" by car. Additionally, the Zvenigorodskaya station is planned within walking distance, the opening of which is expected in 2026.

For daily use, this means stable door-to-door scenarios: some employees get there via the Moscow Central Circle/metro and get to the block with minimal transfers, while others use a car with exits to the Shelepikhinsky Bridge and the Third Transport Ring. Such distributed access reduces the load on the parking lot during peak hours.

Developer

The developer is FSK Group. The company is implementing the Sydney City quarter in stages; according to the press service, the monolithic business center was completed in May 2024, and the commissioning is scheduled for 2025. Also in 2025, FSK announced a partnership with LEGENDA for the joint implementation of parts of the project on the first coastline. According to city and business press reports, the group itself and affiliated structures plan to occupy about half of the office space.

Business center infrastructure

Below is what forms the everyday comfort of users. The first and basement levels cover basic services: public areas, a food block, shops and auxiliary premises. At the perimeter level there is street retail for visitors to the quarter and employees, in the core there are elevator halls, access control and security systems.

  • Functions of the first levels: reception, cafe/canteen, mother and child room, shopping area.

  • IT and security (declared): biometrics (FaceID), video surveillance and analytics, VR monitoring.

  • Engineering systems: supply and exhaust ventilation, central air conditioning.

  • Fire safety: warning system and automatic fire extinguishing.

  • Elevator fleet: 21 elevators designed to handle the traffic of a large business center.

  • Parking: underground three-level parking for 313 spaces (+ 12 for motorcycles); a flat parking lot for ≈ 86 spaces for guests/visitors is also mentioned.

Engineering and technological solutions

The Sydney City office centre is designed as a stand-alone building, with much attention paid to the reliability of engineering and safety. Power supply and heating are centralised, and the water supply systems include uninterrupted hot water supply and multi-stage water purification. The complex includes a reception, security, checkpoints, alarms, video surveillance and electronic passes (ACS). The building has an adjacent territory and has free access, which increases convenience for employees and visitors, and its separate location ensures independence from neighbouring buildings.

Office space options

The layout logic is “clean” class A floors, focused on open space and/or mixed layouts. The rentable fund is estimated by brokers at ≈ 59.8 thousand m², which allows for the formation of a pool of lots of different formats: from medium-sized blocks to large headquarters. The ceiling height of 3.3–3.8 m on typical floors provides flexibility in terms of utility lines and acoustics; increased heights on the first levels are suitable for representative functions.

In terms of placement strategies, the property is equally suitable for both office rental with quick commissioning of areas and for modular consolidation in a long-term outline (if desired, the scenario of "rent an office" on one or several floors with a single front office). For corporate users, there are options to buy an office (a single outline on 1-2 floors) or combined models with a reserve for growth. (Assessments of areas and status are based on brokerage materials.)

About the area

The Sydney City quarter forms a new urban environment on the first line of the Moscow River: its own park and embankment, social infrastructure and commercial services for residents. According to the developer and specialized media, a kindergarten for 350 children has already been opened, a school for 775 children is being completed; residential buildings of subsequent stages and a business center are under construction within the quarter. This reduces the “migration” burden on employees - many services are available without leaving the perimeter.

The urban mobility of the district is supported by its proximity to Moscow-City, the Moscow Central Circle/Shelepikha metro station, exits to the Third Transport Ring and Zvenigorodskoye Shosse. For pedestrian accessibility, connections with the embankment and adjacent quarters of the Big City are emphasized.

Conclusion

Sydney City acts as an "anchor" of the business function on the north-western shoulder of Moscow-City: a large volume of high-quality areas, modern engineering, a strong transport matrix and a rich environment of the quarter. On the demand side - flexibility of lots and technological readiness (including the declared biometric and analytical services), on the management side - the concentration of a significant share of areas with the developer, which usually simplifies the issues of operation and standards of common areas. For companies that need scalable placement of class A near rail lines and the Third Transport Ring, the object covers several key criteria at once - from daily logistics to the representativeness of the first levels.

Show more Hide

Construction stages

Photos inside

All residential complexes of the Big City

Big City News
View all news
Russian Railways may sell Moscow Towers in Moscow City for 220 billion rubles.
03.02.2026
Russian Railways may sell Moscow Towers in Moscow City for 220 billion rubles.
Russian Railways is preparing to put office space in the Moscow Towers complex in Moscow City up for sale. The...
The general contractor for the One skyscraper in Moscow City has been selected.
30.01.2026
The general contractor for the One skyscraper in Moscow City has been selected.
Rencons has been appointed general contractor for the 90-story residential skyscraper One in Moscow City. Deve...
Russia's most expensive office is on display in Moscow City.
30.01.2026
Russia's most expensive office is on display in Moscow City.
The office building in the Federation Tower has become the most expensive offer on the Russian commercial real...
The Big City plans to expand its road network.
25.01.2026
The Big City plans to expand its road network.
The construction and reconstruction of approximately 25 km of roads is planned in the "Big City" area. The pro...
The bionic skyscraper project "Strana.City" has been approved in City-2.
26.12.2025
The bionic skyscraper project "Strana.City" has been approved in City-2.
Moscow authorities have approved the architectural design of the Strana.City complex in the City-2 district. T...
The government has instructed Russian Railways to consider the sale of Moscow Towers in Moscow City.
19.12.2025
The government has instructed Russian Railways to consider the sale of Moscow Towers in Moscow City.
The Russian government is discussing the sale of the Moscow Towers skyscraper in Moscow City, acquired by Russ...
Office complex on Erismana Street near Moscow City: construction approved for 249,000 square meters
18.12.2025
Office complex on Erismana Street near Moscow City: construction approved for 249,000 square meters
Moscow authorities have approved the construction of a multifunctional business complex covering approximately...
Cadastral growth in 2026: "City of Capitals" entered the top of Moscow's most expensive buildings
05.12.2025
Cadastral growth in 2026: "City of Capitals" entered the top of Moscow's most expensive buildings
In 2026, Moscow recalculated the cadastral value of properties. "City of Capitals" rose to the top 10 most exp...
Dau House: Moscow City's first residential skyscraper and a triumph at the 2025 URBAN Awards
28.11.2025
Dau House: Moscow City's first residential skyscraper and a triumph at the 2025 URBAN Awards
Moscow City's first residential skyscraper, Dom Dau, received top marks from URBAN Awards 2025 experts, becomi...
New high-speed highway in the North-West Administrative Okrug: How the connection between Sheremetyevo and Moscow-City will change
24.11.2025
New high-speed highway in the North-West Administrative Okrug: How the connection between Sheremetyevo and Moscow-City will change
A key infrastructure route connecting Sheremetyevo Airport and Moscow-City is being developed in the North-Wes...
City 2: How a comprehensive engineering scheme is transforming a vacant lot into a new business center
18.11.2025
City 2: How a comprehensive engineering scheme is transforming a vacant lot into a new business center
Moscow has approved a comprehensive utility plan for the City-2 project, a 25-hectare site adjacent to the Mos...
Construction of the new TOP TOWER skyscraper has been approved in the Presnensky District.
13.11.2025
Construction of the new TOP TOWER skyscraper has been approved in the Presnensky District.
Mosgosstroynadzor has approved the construction of a new skyscraper, TOP TOWER, nearly 300 meters tall, within...
Double-deck high-speed elevators at iCITY bring a new level of vertical mobility to Moscow City.
12.11.2025
Double-deck high-speed elevators at iCITY bring a new level of vertical mobility to Moscow City.
The iCITY business complex in Moscow City has launched Russia's first double-deck elevators with a maximum spe...
STONE will build 200,000 m² of office space in the Big City on Shmitovsky Proezd.
06.11.2025
STONE will build 200,000 m² of office space in the Big City on Shmitovsky Proezd.
STONE (Stonehenge) has begun engineering work on a 2.4-hectare site in the Moscow-City district. A new busines...
Improvements in the "Big City": alleys, terraces, and sports areas near the JOIS Business Center
30.10.2025
Improvements in the "Big City": alleys, terraces, and sports areas near the JOIS Business Center
In the "Big City" business district, over 1.3 hectares of land adjacent to the JOIS business center are being...
Working in Moscow City: A Bonus Opportunity or a Punishment?
28.10.2025
Working in Moscow City: A Bonus Opportunity or a Punishment?
58% of Moscow City employees are dissatisfied with crowds and high prices, while 42% value prestige, views, an...
MR Group has launched the TOP TOWER office skyscraper near iCity.
23.10.2025
MR Group has launched the TOP TOWER office skyscraper near iCity.
Developer MR Group has opened office sales in the new TOP TOWER skyscraper, the second phase of the iCity proj...
Office space is rapidly disappearing in Moscow City.
19.10.2025
Office space is rapidly disappearing in Moscow City.
Moscow City, the capital's largest business cluster, is experiencing a historic low in vacant office space...
Unique elevator winches in the 340-meter Dau House skyscraper
29.09.2025
Unique elevator winches in the 340-meter Dau House skyscraper
The 87-story residential complex "Dom Dau" in Moscow City will feature high-speed elevators with innovative wi...
Moscow City's office space will grow almost 50% by 2030–2031.
27.08.2025
Moscow City's office space will grow almost 50% by 2030–2031.
By 2030-2031, Moscow will see the emergence of new towers (iCITY-2, One, Sezar Tower, Empire II, Bagration Bri...

Any questions about the City?

Ask us. We know everything about Moscow-City.

By sending a message you agree to the privacy policy
personal data processing
and user agreement

General map of Moscow-City facilities

About us and Moscow-City

Moscow International Business Center (MIBC) "Moscow City" is a unique urban development complex, where all aspects of the future business and cultural-social district are taken into account.

Developed technological infrastructure, ideal conditions for doing business and equipped recreational spaces are what makes MIBC "Moscow City" a new landmark of the capital.

"Moscow City" is not only about work: on the territory of "Moscow City" there is a museum-observation deck, shops and restaurants, fitness clubs, entertainment for children, city institutions. Everything you need for life and recreation.