Beregovoy pr-d, vl. 3, bldg. 1-11

About the property

  • Ceiling height 3.00
  • Completion date 09/01/2025
  • Developer Developer "Glavstroy"
  • Index 121087
  • Map 55.757379,37.508867
  • Housing class Business
  • Number of apartments 1097
  • Number of buildings 11
  • Location Beregovoy pr-d, vl. 3, bldg. 1-11
  • Metro Fili
  • Start of construction 29.12.2017
  • Total area (sq.m) 67,856 sq.m.
  • Completion of construction 2025
  • District JSC
  • Parking underground, there is an open one
  • Parking spaces 430
  • Area of apartments from 40.7 to 154 m²
  • District Filevsky Park
  • Distance from the metro 18 min walk
  • Deadline 2025
  • Type of house Monolithic
  • Prices from 35 to 66.1 million ₽
  • Number of floors from 8 to 29
Need help choosing a property?
Submit a request

Description

The residential quarter "Beregovoy" is a completely self-sufficient huge residential complex of business class, located directly on the bank of the Moskva River on Beregovoy proezd, 3. Its huge panoramic windows, which in some apartments are even present in the bathrooms, high ceilings, competent layouts, an amazing view of the city panorama, convenient location and harmonious improvement of the adjacent territory in combination with ready rough and fine finishing of apartments make this complex one of the leaders among all new buildings of the Western Administrative District.

History of construction


The residential complex "Beregovoy", occupying an area of 31.6 hectares, began to be built in March 2018, and today the first stage has already been commissioned. The delivery of the second stage is scheduled for the third quarter of 2025.

The developer of the project is the company "Glavstroy", which is also the investor of the project. It is one of the system-forming companies, which eliminates doubts about the future of the complex. The architect who designed it was Ivan Grekov. It was thanks to him that the residential complex "Beregovoy" turned into a real wave and waterfalls, although it has much in common with London, Chicago and Manhattan skyscrapers. As the architect himself said, he was inspired by the river theme. Therefore, the complex received facades made of brick, as well as glass and aluminum, which reflect the river surface.

But if the first, already completed stage of the complex has more traditional outlines and harmonizes well with the surrounding urban environment, then the second is like a continuation of the river and the Beregovoy quarter itself. As a result, the facades personify waterfalls, and the bluish reflection of the water surface only completes this impression. At the same time, a particularly expressive feature of the complex is the different heights of the buildings and their shape, which made it possible to accurately display the wave. All this leaves the architecture of the complex outside of time, giving it eternal relevance.

The construction of the complex is carried out using funds from Sberbank, and the management company is responsible for all organizational issues and maintenance of the complex. At the same time, you can buy an apartment in it without leaving your home under the DDU. There are also 3 payment options: 100% payment, installments and mortgage.

Construction Features


The first stage of the project includes 11 buildings located in a triangle. They differ in height, which ranges from 8 to 29 floors. The first stage of Beregovoy is already fully operational. The second stage will be no less large-scale.

The residential complex fully complies with business class standards, and in some respects even exceeds them. It is being built using monolithic technology with seamless stone block walls, which provides excellent noise and heat insulation. The ceiling height will be 3 m. Its facades were designed using

Anodized aluminum was used, which is lightweight, durable and safe, as well as clinker brick, which reflects the natural origin and lasts for centuries.

The complex has all the engineering systems carefully thought out, which has allowed the apartment owners to enjoy high quality and safety of life even in the immediate vicinity of the city center. It has:

· supply and exhaust ventilation and central air conditioning system;

· air purification system and climate control in each apartment with the ability to individually adjust the temperature and humidity (2nd stage);

· energy-efficient double-glazed windows with a height of 210 cm and aluminum profiles;

· high-speed elevators.

Security is of great importance in the residential complex "Beregovoy". CCTV cameras are installed throughout the complex, and the security service monitors the peace and safety of residents around the clock. At the same time, IP intercom is provided, redirecting calls to the doorbell to a smartphone.

The developer also eliminated the need to use keys in the usual sense of the word by installing NFC locks in apartments. Therefore, to get home, you will not need to rummage through your bag for a long time, weigh down your pockets with keys, because you can simply use your smartphone. This function also allows you to issue a temporary key to a called cleaner or guest.

The design of public spaces is made using soft tones and natural materials with an unusual combination of brick and brass, but even in the smallest details the river theme can be traced. And the multifunctional lobby, in addition to panoramic windows, can boast 7-meter ceilings. The main lobby is located in the 6th section of the 1st stage of the residential complex "Beregovoy", but each house has its own cozy hall, which is not only pleasant to go down to in the morning before work, but also to spend time in the evenings or on weekends.

Residential complex "Beregovoy" today


In the residential complex "Beregovoy" all apartments are rented to owners with a fully finished designer finish or in a White box condition. The latter option leaves room for imagination and allows you to implement any ideas in the interior, while all the dustiest and noisiest work will be done for you. After all, the White box finish implies not only walls and ceilings completely ready for decoration, but also a complete wiring of electrical and plumbing. When choosing any of the 42 apartments with a finished finish, the buyer can expect only high-quality natural materials: wood, porcelain stoneware, glass, quartz, eco-friendly coatings, etc. In such apartments, doors, lamps, plumbing and even a fully functional kitchen with all built-in large household appliances are already installed. Therefore, all that remains is to arrange the furniture.
Show more Hide

Construction stages

Photos inside

Diagrams, drawings and 3D models

All residential complexes of the Big City

Big City News
View all news
The bionic skyscraper project "Strana.City" has been approved in City-2.
26.12.2025
The bionic skyscraper project "Strana.City" has been approved in City-2.
Moscow authorities have approved the architectural design of the Strana.City complex in the City-2 district. T...
The government has instructed Russian Railways to consider the sale of Moscow Towers in Moscow City.
19.12.2025
The government has instructed Russian Railways to consider the sale of Moscow Towers in Moscow City.
The Russian government is discussing the sale of the Moscow Towers skyscraper in Moscow City, acquired by Russ...
Office complex on Erismana Street near Moscow City: construction approved for 249,000 square meters
18.12.2025
Office complex on Erismana Street near Moscow City: construction approved for 249,000 square meters
Moscow authorities have approved the construction of a multifunctional business complex covering approximately...
Cadastral growth in 2026: "City of Capitals" entered the top of Moscow's most expensive buildings
05.12.2025
Cadastral growth in 2026: "City of Capitals" entered the top of Moscow's most expensive buildings
In 2026, Moscow recalculated the cadastral value of properties. "City of Capitals" rose to the top 10 most exp...
Dau House: Moscow City's first residential skyscraper and a triumph at the 2025 URBAN Awards
28.11.2025
Dau House: Moscow City's first residential skyscraper and a triumph at the 2025 URBAN Awards
Moscow City's first residential skyscraper, Dom Dau, received top marks from URBAN Awards 2025 experts, becomi...
New high-speed highway in the North-West Administrative Okrug: How the connection between Sheremetyevo and Moscow-City will change
24.11.2025
New high-speed highway in the North-West Administrative Okrug: How the connection between Sheremetyevo and Moscow-City will change
A key infrastructure route connecting Sheremetyevo Airport and Moscow-City is being developed in the North-Wes...
City 2: How a comprehensive engineering scheme is transforming a vacant lot into a new business center
18.11.2025
City 2: How a comprehensive engineering scheme is transforming a vacant lot into a new business center
Moscow has approved a comprehensive utility plan for the City-2 project, a 25-hectare site adjacent to the Mos...
Construction of the new TOP TOWER skyscraper has been approved in the Presnensky District.
13.11.2025
Construction of the new TOP TOWER skyscraper has been approved in the Presnensky District.
Mosgosstroynadzor has approved the construction of a new skyscraper, TOP TOWER, nearly 300 meters tall, within...
Double-deck high-speed elevators at iCITY bring a new level of vertical mobility to Moscow City.
12.11.2025
Double-deck high-speed elevators at iCITY bring a new level of vertical mobility to Moscow City.
The iCITY business complex in Moscow City has launched Russia's first double-deck elevators with a maximum spe...
STONE will build 200,000 m² of office space in the Big City on Shmitovsky Proezd.
06.11.2025
STONE will build 200,000 m² of office space in the Big City on Shmitovsky Proezd.
STONE (Stonehenge) has begun engineering work on a 2.4-hectare site in the Moscow-City district. A new busines...
Improvements in the "Big City": alleys, terraces, and sports areas near the JOIS Business Center
30.10.2025
Improvements in the "Big City": alleys, terraces, and sports areas near the JOIS Business Center
In the "Big City" business district, over 1.3 hectares of land adjacent to the JOIS business center are being...
Working in Moscow City: A Bonus Opportunity or a Punishment?
28.10.2025
Working in Moscow City: A Bonus Opportunity or a Punishment?
58% of Moscow City employees are dissatisfied with crowds and high prices, while 42% value prestige, views, an...
MR Group has launched the TOP TOWER office skyscraper near iCity.
23.10.2025
MR Group has launched the TOP TOWER office skyscraper near iCity.
Developer MR Group has opened office sales in the new TOP TOWER skyscraper, the second phase of the iCity proj...
Office space is rapidly disappearing in Moscow City.
19.10.2025
Office space is rapidly disappearing in Moscow City.
Moscow City, the capital's largest business cluster, is experiencing a historic low in vacant office space...
Unique elevator winches in the 340-meter Dau House skyscraper
29.09.2025
Unique elevator winches in the 340-meter Dau House skyscraper
The 87-story residential complex "Dom Dau" in Moscow City will feature high-speed elevators with innovative wi...
Moscow City's office space will grow almost 50% by 2030–2031.
27.08.2025
Moscow City's office space will grow almost 50% by 2030–2031.
By 2030-2031, Moscow will see the emergence of new towers (iCITY-2, One, Sezar Tower, Empire II, Bagration Bri...
Strana.City: residential skyscrapers in Kamushki — sales launch imminent
21.08.2025
Strana.City: residential skyscrapers in Kamushki — sales launch imminent
Strana Development has officially announced the name of its residential project located on Plot 3 in the Kamus...
The international competition for the architectural concept of Lot 2 "City-2" has started in Moscow.
18.08.2025
The international competition for the architectural concept of Lot 2 "City-2" has started in Moscow.
Since August 18, Moscow has launched a closed international competition to develop the architectural concept f...
Moscow-City 2 kicks off with road reconstruction: infrastructure for a future business cluster
13.08.2025
Moscow-City 2 kicks off with road reconstruction: infrastructure for a future business cluster
Preparatory work has begun for the "City 2" project in Moscow's Kamushki district. By 2028, three kilometers o...
Moscow Exchange is considering moving to the Imperia 2 office under construction in Moscow City.
06.08.2025
Moscow Exchange is considering moving to the Imperia 2 office under construction in Moscow City.
The Moscow Exchange (MOEX) is considering acquiring office space in the Empire II skyscraper, which is...

Any questions about the City?

Ask us. We know everything about Moscow-City.

By sending a message you agree to the privacy policy
personal data processing
and user agreement

General map of Moscow-City facilities

A brief overview of us and Moscow-City

Moscow International Business Center (MIBC) "Moscow City" is a unique urban development complex, where all aspects of the future business and cultural-social district are taken into account.

Developed technological infrastructure, ideal conditions for doing business and equipped recreational spaces are what makes MIBC "Moscow City" a new landmark of the capital.

"Moscow City" is not only about work: on the territory of "Moscow City" there is a museum-observation deck, shops and restaurants, fitness clubs, entertainment for children, city institutions. Everything you need for life and recreation.