EN
RU ZH AR
Beregovoy pr-d, vl. 3, bldg. 1-11

About the property

  • Ceiling height 3.00
  • Completion date 09/01/2025
  • Developer Developer "Glavstroy"
  • Index 121087
  • Map 55.757379,37.508867
  • Housing class Business
  • Number of apartments 1097
  • Number of buildings 11
  • Location Beregovoy pr-d, vl. 3, bldg. 1-11
  • Metro Fili
  • Start of construction 29.12.2017
  • Total area (sq.m) 67,856 sq.m.
  • Completion of construction 2025
  • District JSC
  • Parking underground, there is an open one
  • Parking spaces 430
  • Area of apartments from 40.7 to 154 m²
  • District Filevsky Park
  • Distance from the metro 18 min walk
  • Deadline 2025
  • Type of house Monolithic
  • Prices from 35 to 66.1 million ₽
  • Number of floors from 8 to 29
Need help choosing a property?
Submit a request

Description

The residential quarter "Beregovoy" is a completely self-sufficient huge residential complex of business class, located directly on the bank of the Moskva River on Beregovoy proezd, 3. Its huge panoramic windows, which in some apartments are even present in the bathrooms, high ceilings, competent layouts, an amazing view of the city panorama, convenient location and harmonious improvement of the adjacent territory in combination with ready rough and fine finishing of apartments make this complex one of the leaders among all new buildings of the Western Administrative District.

History of construction


The residential complex "Beregovoy", occupying an area of 31.6 hectares, began to be built in March 2018, and today the first stage has already been commissioned. The delivery of the second stage is scheduled for the third quarter of 2025.

The developer of the project is the company "Glavstroy", which is also the investor of the project. It is one of the system-forming companies, which eliminates doubts about the future of the complex. The architect who designed it was Ivan Grekov. It was thanks to him that the residential complex "Beregovoy" turned into a real wave and waterfalls, although it has much in common with London, Chicago and Manhattan skyscrapers. As the architect himself said, he was inspired by the river theme. Therefore, the complex received facades made of brick, as well as glass and aluminum, which reflect the river surface.

But if the first, already completed stage of the complex has more traditional outlines and harmonizes well with the surrounding urban environment, then the second is like a continuation of the river and the Beregovoy quarter itself. As a result, the facades personify waterfalls, and the bluish reflection of the water surface only completes this impression. At the same time, a particularly expressive feature of the complex is the different heights of the buildings and their shape, which made it possible to accurately display the wave. All this leaves the architecture of the complex outside of time, giving it eternal relevance.

The construction of the complex is carried out using funds from Sberbank, and the management company is responsible for all organizational issues and maintenance of the complex. At the same time, you can buy an apartment in it without leaving your home under the DDU. There are also 3 payment options: 100% payment, installments and mortgage.

Construction Features


The first stage of the project includes 11 buildings located in a triangle. They differ in height, which ranges from 8 to 29 floors. The first stage of Beregovoy is already fully operational. The second stage will be no less large-scale.

The residential complex fully complies with business class standards, and in some respects even exceeds them. It is being built using monolithic technology with seamless stone block walls, which provides excellent noise and heat insulation. The ceiling height will be 3 m. Its facades were designed using

Anodized aluminum was used, which is lightweight, durable and safe, as well as clinker brick, which reflects the natural origin and lasts for centuries.

The complex has all the engineering systems carefully thought out, which has allowed the apartment owners to enjoy high quality and safety of life even in the immediate vicinity of the city center. It has:

· supply and exhaust ventilation and central air conditioning system;

· air purification system and climate control in each apartment with the ability to individually adjust the temperature and humidity (2nd stage);

· energy-efficient double-glazed windows with a height of 210 cm and aluminum profiles;

· high-speed elevators.

Security is of great importance in the residential complex "Beregovoy". CCTV cameras are installed throughout the complex, and the security service monitors the peace and safety of residents around the clock. At the same time, IP intercom is provided, redirecting calls to the doorbell to a smartphone.

The developer also eliminated the need to use keys in the usual sense of the word by installing NFC locks in apartments. Therefore, to get home, you will not need to rummage through your bag for a long time, weigh down your pockets with keys, because you can simply use your smartphone. This function also allows you to issue a temporary key to a called cleaner or guest.

The design of public spaces is made using soft tones and natural materials with an unusual combination of brick and brass, but even in the smallest details the river theme can be traced. And the multifunctional lobby, in addition to panoramic windows, can boast 7-meter ceilings. The main lobby is located in the 6th section of the 1st stage of the residential complex "Beregovoy", but each house has its own cozy hall, which is not only pleasant to go down to in the morning before work, but also to spend time in the evenings or on weekends.

Residential complex "Beregovoy" today


In the residential complex "Beregovoy" all apartments are rented to owners with a fully finished designer finish or in a White box condition. The latter option leaves room for imagination and allows you to implement any ideas in the interior, while all the dustiest and noisiest work will be done for you. After all, the White box finish implies not only walls and ceilings completely ready for decoration, but also a complete wiring of electrical and plumbing. When choosing any of the 42 apartments with a finished finish, the buyer can expect only high-quality natural materials: wood, porcelain stoneware, glass, quartz, eco-friendly coatings, etc. In such apartments, doors, lamps, plumbing and even a fully functional kitchen with all built-in large household appliances are already installed. Therefore, all that remains is to arrange the furniture.
Show more Hide

Construction stages

Photos inside

Diagrams, drawings and 3D models

All residential complexes of the Big City

Big City News

View all news
Architectural rendering of Light City façades in Greater City
05.11.2026
Light City in Greater City: Building A rises as phase two receives approval
Construction continues at Light City. We review October photographs of...
More than 1,000 passengers used the Moscow City stop during the first month of Lastochka service
04.11.2026
More than 1,000 passengers used the Moscow City stop during the first month of Lastochka service
The Federal Passenger Company has reviewed the first month of Lastochk...
Supply of new offices for sale in Moscow City grew eightfold in nine months
03.11.2026
Supply of new offices for sale in Moscow City grew eightfold in nine months
Since January, the supply of new offices in Moscow City has risen from...
Severstal supplied 8,600 tonnes of steel for the columns of One Tower in Moscow City
02.11.2026
Severstal supplied 8,600 tonnes of steel for the columns of One Tower in Moscow City
A total of 8,600 tonnes of S440 rolled steel has been supplied for the...
Visualisations released of a 450-metre “Jenga” tower near Moscow City
01.11.2026
Visualisations released of a 450-metre “Jenga” tower near Moscow City
A 450-metre residential tower is being designed on Antonova-Ovseenko S...
Three pedestrian zones have been established in Moscow City: what has changed in the first phase
29.10.2026
Three pedestrian zones have been established in Moscow City: what has changed in the first phase
The main work on the first phase of the Moscow City improvement projec...
IQ Quarter: Court Refuses to Waive Facade Repair Fees Following UAV Incident
27.10.2026
IQ Quarter: Court Refuses to Waive Facade Repair Fees Following UAV Incident
The court dismissed the lawsuit challenging the fees for repairing the...
The excavation for the "Rossiya" center in Moscow City is more than 90% complete
26.10.2026
The excavation for the "Rossiya" center in Moscow City is more than 90% complete
Near Moscow City, more than 650,000 cubic meters of soil have been exc...
From Leningradskoye Highway to Moscow City: How the New Road Along the MCC Is Being Built
22.10.2026
From Leningradskoye Highway to Moscow City: How the New Road Along the MCC Is Being Built
New photos of the construction of the road to Moscow City near Streshn...
173 piles for two towers: Fensma Reveals the Foundation Specifications for “Aurus Residences”
20.10.2026
173 piles for two towers: Fensma Reveals the Foundation Specifications for “Aurus Residences”
Fensma has revealed the details of the foundation for “Aurus Residence...
Construction of a 450-meter-tall residential skyscraper has been approved near Moscow City
15.10.2026
Construction of a 450-meter-tall residential skyscraper has been approved near Moscow City
Permission has been granted to build a residential complex with 1,018 ...
One in four establishments in Moscow City is a coffee shop: how the foodservice industry is changing
12.10.2026
One in four establishments in Moscow City is a coffee shop: how the foodservice industry is changing
According to CORE.XP, the share of coffee shops in Moscow City’s food ...
Office space in Moscow City has dropped in price to 40,000 rubles per unit
09.10.2026
Office space in Moscow City has dropped in price to 40,000 rubles per unit
The cost of a workstation at the Moscow City service office has fallen...
The "Russia" National Center near Moscow City: "Pokrov," an amphitheater, and plans for 2029
06.10.2026
The "Russia" National Center near Moscow City: "Pokrov," an amphitheater, and plans for 2029
Natalia Virtuozova confirmed the plan to open on November 4, 2029. Her...
"Sofia" has completed the tunneling work between "SberCity" and "Novorizhskaya"
03.10.2026
"Sofia" has completed the tunneling work between "SberCity" and "Novorizhskaya"
The mayor of Moscow announced the completion of the 2.52 km right tunn...
The northern concourse and the third platform have opened at the “Moscow City” station on MCD-1
01.10.2026
The northern concourse and the third platform have opened at the “Moscow City” station on MCD-1
At the “Moscow City” station on MCD-1, the north entrance hall—which l...
450 meters and 1,018 apartments: New specifications for the tower in “City-2” have been released
24.09.2026
450 meters and 1,018 apartments: New specifications for the tower in “City-2” have been released
A source familiar with the matter reported that a 450-meter tower in “...
TOP TOWER in Moscow City: First Concrete Pour Completed
23.09.2026
TOP TOWER in Moscow City: First Concrete Pour Completed
A ceremonial pouring of the first cubic meter of concrete took place a...

Any questions about the City?

Ask us. We know everything about Moscow-City.

By sending a message you agree to the privacy policy
personal data processing
and user agreement

General map of Moscow-City facilities

A brief overview of us and Moscow-City

Moscow International Business Center (MIBC) "Moscow City" is a unique urban development complex, where all aspects of the future business and cultural-social district are taken into account.

Developed technological infrastructure, ideal conditions for doing business and equipped recreational spaces are what makes MIBC "Moscow City" a new landmark of the capital.

"Moscow City" is not only about work: on the territory of "Moscow City" there is a museum-observation deck, shops and restaurants, fitness clubs, entertainment for children, city institutions. Everything you need for life and recreation.